Diada per a la Reducció de Residus
by: Ajuntament de Pollença
Spain
- Pollença
22/11/2016
Description:
The hotel is installing 3 separate waste bins – Glass, Paper & Plastic- in each floor of the hotel. Once the waste is collected from the rooms this is separated at source and deposited in the corresponding waste bin. Once a day then these waste bins are all collected and their contents emptied in the corresponding skips.
Country:
Address:
Entity:
Dates of the proposed action:
Check out other actions that will cover these themes: