Solid Waste Landfill and Disposal Facility Project

Info

WHAT will be done

Description:

With our Solid Waste Regular Storage and Disposal Facility project, which we plan to establish in the designated area between Karabük Organized Industrial Zone and Hurdacılar Site, 300 tons of waste will be processed daily and 6 megawatts of electricity will be produced. With this facility, the 50-year solid waste problem of Karabük and its districts will be solved.

With this facility, the pollution of groundwater will be prevented, garbage leachate will be controlled and the risk of fire and explosion will be eliminated with the methane gas collection system.

With this facility, the pollution of groundwater will be prevented, garbage leachate will be controlled and the risk of fire and explosion will be eliminated with the methane gas collection system.

  • Total Area 310.000 M2,
  • 300 tons of waste processing capacity per day,
  • 30.000 M2 Landfill,
  • Separation and Power Generation Facility with 10.000 M2 Closed Area,
  • 6 Megawatt Electricity Generation,
  • Meeting the Electricity Need of Approximately 9,000 Households with the Energy Generated,
  • 75 People Employment Opportunity.

Location

WHERE it will take place

Country:

Turkey

Address:

Karabük
Zopran
1
78100

Action Developer

WHO will run the show

Entity:

Karabük Belediye Başkanlığı
# Administration/Public Authority

How can you get in contact:

https://www.karabuk.bel.tr/proje.asp?id=276

Email: karabuk@karabuk.bel.tr
Telefon: 444 21 78

• WHEN

will it happen?

Dates of the proposed action:

21/11/20, 22/11/20, 23/11/20, 24/11/20, 25/11/20, 26/11/20, 27/11/20, 28/11/20, 29/11/20

• WHY

join hands and minds to prevent waste?

Check out other actions that will cover these themes:

Waste sorting and recycling

Help the world,
share this action!

Related actions