Solid Waste Landfill and Disposal Facility Project
• WHAT will be done
Description:
With our Solid Waste Regular Storage and Disposal Facility project, which we plan to establish in the designated area between Karabük Organized Industrial Zone and Hurdacılar Site, 300 tons of waste will be processed daily and 6 megawatts of electricity will be produced. With this facility, the 50-year solid waste problem of Karabük and its districts will be solved.
With this facility, the pollution of groundwater will be prevented, garbage leachate will be controlled and the risk of fire and explosion will be eliminated with the methane gas collection system.
With this facility, the pollution of groundwater will be prevented, garbage leachate will be controlled and the risk of fire and explosion will be eliminated with the methane gas collection system.
- Total Area 310.000 M2,
- 300 tons of waste processing capacity per day,
- 30.000 M2 Landfill,
- Separation and Power Generation Facility with 10.000 M2 Closed Area,
- 6 Megawatt Electricity Generation,
- Meeting the Electricity Need of Approximately 9,000 Households with the Energy Generated,
- 75 People Employment Opportunity.
Location
• WHERE it will take place
Country:
Address:
Action Developer
• WHO will run the show
Entity:
How can you get in contact:
Email: karabuk@karabuk.bel.tr
Telefon: 444 21 78
• WHEN
will it happen?
Dates of the proposed action:
• WHY
join hands and minds to prevent waste?
Check out other actions that will cover these themes: